Background
In 1999 the copper
wire rod production was put into operation on the territory of the biggest
Europe cop-per refiner JSC
"Uralelectromed". Thus the company spe-cialized on cathode
copper production has made a progress in expansion of the range of the
produced goods.
JSC "Uralelectromed" has its own developed
raw materials source that influences to capacity utilization and provides
the stable conditions for company operation. The raw material treatment
is 300,000 tpy.
JSC "Uralelectromed" is one of the main founders
of Joint Venture "Katur-lnvest" which included the copper wire
rod production in October of 1999. The company design production capacity
of copper wire rod is 235,000 tpy.
The strong argument for the integration of the technologically
and economically connected enterprises was introduction of "Sibcable"
and "Emalprovod"
located in Tomsk to the "Ural Mining Metallurgical Company".
|
|
|
 |
ZAO
JV"Katur-Invest"
1,Lenin Street, Verkhnyaya Pyshma, Sverdlovsk region, Russia, 624091
Tel: +34368 47152, 47141
Fax: +34368 47151, 47186
E-mail:katanka@elem.ru
ZAO Trade house "Uralelecrtomed-Katur"
7,Chayanova Street,Building 1, Moscow,215047
Tel: +095 745-29-21,745-29-22,745-29-23
Fax: +095 745-29-24,745-29-25
E-mail: S.Podkolzin@elem.ru
Web-designers:
Zvereva Veronika Aleksandrovna
Olkova Anastasiya Evgenevna |
|